Albemarle PC to hold work session on stream protection overlay; public hearing for Montclair development in Crozet 

The Albemarle Planning Commission meets at 4 p.m. in Lane Auditorium of the county office building at 401 McIntire Road. (meeting info) (agenda)

The work session will review work to date on the establishment of a riparian buffer overlay district. Since 2017, county staff have been working on the development of strategies to improve the health of streams. A first phase is complete with thirteen proposals, some of which have been implemented. 

“Proposal 1 of the Stream Health Initiative was for the creation of a stream-buffer overlay district within the Zoning Ordinance, with the goal of re-establishing the pre-2014 Water Protection Ordinance (WPO) requirement to retain existing wooded stream buffers throughout the defined buffer areas,” reads the staff report

At the moment, these buffers are only required during the land disturbing activities. A public engagement process is complete for a draft ordinance. 

“The next step for this project will be for staff to prepare a revised draft of these ordinances, taking the public input and the Planning Commission’s input into account,” the report continues. 

A description of the purpose of the Stream Health Overlay district. Review the staff report for more information

There are two public hearings. 

The first is for a special use permit for Home Depot to have outdoor storage and display at their new facility. 

“The proposal includes the storage, display, and sale (“display”) of garden and related merchandise in the fenced, open-air, partially roofed Garden Center and in various locations outside the buildings,” reads the staff report.

A sad man walks in front of the proposed Home Depot at Fashion Square Mall in this rendering.” (Credit: MG2) 

The second is for a rezoning in Crozet that is now known as Montclair but had been known as White Gate Village. Developer Vito Cetta wants around 15 acres to the Neighborhood Model District for construction of a maximum of 122 units as well as an amendment to the jurisdictional areas of the Albemarle County Service Authority. 

The Comprehensive Plan calls for a mixture of Neighborhood Density Residential (3 to 6 units per acre) and Middle Density Residential (6 to 12 units, or up to 18 if affordable housing units are provided).

The county’s Water Protection Ordinance comes into play here. The classification of a stream that runs along the property has been disputed. In January, the county engineer determined the stream is intermittent which brings requirements for vegetated buffers. 

“The developer of Montclair appealed this determination because they believed the stream was more appropriately classified as an ephemeral stream, and therefore would not be subject to further regulation under the WPO,” reads the staff report.

The Director of Community Development upheld the county engineer and the developer revised the proposal accordingly. 

A chart depicting the unit counts for the Montclair development (Shimp Engineering)

Before you go: The time to write and research of this article is covered by paid subscribers to Charlottesville Community Engagement. In fact, this particular installment comes from the September 25, 2023 Week Ahead. To ensure this research can be sustained, please consider becoming a paid subscriber or contributing monthly through Patreon.

Leave a Reply

Discover more from Information Charlottesville

Subscribe now to keep reading and get access to the full archive.

Continue reading